Rockies Express Pipeline

Rockies Express Pipeline — Entrega

Rockies Express — Entrega (REX — Entrega), formerly known as the Entrega Pipeline, is a FERC-certificated 328-mile pipeline that was purchased by Rockies Express Pipeline LLC in February 2006 and is now a part of the overall Rockies Express pipeline system. REX — Entrega runs from the Meeker Hub in Rio Blanco County, Colorado, to the Cheyenne Hub in Weld County, Colorado.

Rockies Express — Entrega consists of the following facilities:

  • REX — Entrega Segment 1 is 136 miles of 36-inch diameter pipeline from the Meeker Hub near Meeker, Colorado in Rio Blanco County to the Wamsutter Hub near Wamsutter in Sweetwater County, Wyoming. This section was placed in service in February 2006.
  • REX — Entrega Segment 2 is 192 miles of 42-inch diameter pipe from the Wamsutter Hub to the Cheyenne Hub in Weld County, Colorado. Construction began in July 2006 and was placed in service in February 2007.
  • New compressor facilities near Meeker in Rio Blanco County, Colorado, and Wamsutter in Sweetwater County, Wyoming are currently being built.
  • Various meter stations and interconnections to existing pipeline systems.